
Section 05 ELECTRICAL SYSTEM
Subsection 03 (STARTING SYSTEM)
If the starter turns, ensure wiring harness and con-
nectors between battery and starter are in good
condition. See procedure above.
If the starter does not turn, replace it.
STARTER REMOVAL
Disconnect BLACK (-) cable from battery then the
RED (+) cable.
WARNING
Always disconnect BLACK (-) cable first.
Remove tuned pipe.
Disconnect RED cable from starter.
Disconnect ground cable from starter.
Unbolt and remove starter from engine.
STARTER INSTALLATION
Use new teflon washers on the 3 bolts retaining
starter to engine.
Torque the bolts to 28 N•m (20 lbf•ft).
Connect the RED wire to the large terminal of the
starter.
Torque large terminal nut to 7 N•m (62 lbf•
in
).
Connect ground cable to the starter with star
washer in between.
Torque ground cable connecting bolt to 11 N•m
(97 lbf•
in
).
Install battery cables.
WARNING
Always connect RED (+) cable first.
174
mmr2005-129
Содержание 2005 MACH Z
Страница 2: ......
Страница 3: ...2005 Shop Manual RT SERIES BOMBARDIER RECREATIONAL PRODUCTS INC...
Страница 40: ...Section 02 ENGINE Subsection 02 AIR INTAKE SYSTEM AIR INTAKE SYSTEM A35C02S mmr2005 149 15...
Страница 220: ...Section 06 DRIVE SYSTEM Subsection 03 DRIVEN PULLEY A35D1BA Install circlip mmr2005 133 207...
Страница 339: ...Section 11 WIRING DIAGRAMS Subsection 01 WIRING DIAGRAMS A35Z01S 2005 MACH Z RT SUMMIT RT ENGINE 334 MMR2005 146...
Страница 340: ...NOTES...
Страница 341: ...NOTES...
Страница 342: ...2005 MACH Z RT SUMMIT RT A35Z02...
Страница 343: ......