Cable connections
5 - 3
Siemens-Elema AB
Register 3
SP B7-230.033.07
Page 3 of 14
Mammomat 1000/3000
Solna, Sweden
Rev. 03
11.99
SPS-UD
Installation and Start-Up
EMC measures on the bottom plate
5
Fitting the cables X1, X8 and X9 onto the bottom plate
5
1.
Fit the bottom plate at the bottom of the generator stand as shown in Fig. 3.
2.
Carefully cut away the insulation on cables X1, X8 and X9 to lay bare the shield
braid (1).
3.
Select proper clamps (2) with regard to the thickness of the cables. Cable clamps
in different sizes are provided on the bottom plate.
4.
Fit the clamp (2) over the shield braid and screw tight to ensure satisfactory
contact between shield braid and clamp.
5.
Fasten the bottom plate with four screws (3) and contact washers (4).
Fig. 3
Bottom plate
Cable X9 shall also be clamped to the side wall of the cabinet, if
not already done, see Fig. 7 in this chapter.
Do not remove insulation and do not ground the shields of the
IONTOMAT signal cables to X10 and X11.
1
2
3
4
MA
M00
099
NOTICE
NOTICE