19 - 1
Siemens-Elema AB
Register 3
SP B7-230.033.07
Page 1 of 4
Mammomat 1000/3000
Solna, Sweden
Rev. 03
11.99
SPS-UD
Installation and Start-Up
Bolting the stand/generator to the floor
19
Stativ and generator with integrated radiation shield and control
panel
19
Should a permanent fastening to the floor be required due to local regulations (for exam-
ple in earthquake areas) or due to the quality of the floor covering, the stand/generator
can be secured to the floor by means safety dowels and screws. When bolting the stand
to the floor, the fixing screws shall pass through the hollow levelling screws (1). When
bolting the generator with integrated radiation shield and control panel to the floor, the pre-
drilled fixing holes (2) shall be used.
1.
Position the stand /generator and mark out appropriate fixing holes on the floor,
using the base plate as a template.
2.
Drill the holes and insert dowels and screws (use Liebig safety dowel M6 S10/35
and washer DIN 9021B, ISO 7093 or equivalent. Tighten the screws to 10 Nm.
Fig. 1
Base plate for the stand
Fig. 2
Base plate for the generator
The base plates shall be secured with at least four screws each
(two on either side).
Make sure that the screws do not come in contact with any con-
ductive material such as reinforcing iron.
MAM00138
1
MAM00139
2
2
NOTICE
CAUTION