Mammomat 1000/3000
Register 3
SP B7-230.033.07
Page 4 of 6
Siemens-Elema AB
Installation and Start-Up
Rev. 03
11.99
SPS-UD
Solna, Sweden
1 - 4
Prerequisites
Important notes on start-up
1
The MAMMOMAT is adjusted, programmed and tested in the factory, leaving only the
adaption to the on-site mains voltage and the functional tests to be performed.
When the measurements to be made (kV, mAs, etc.) are within the tolerances stated in
these instructions, this confirms that the settings made in the factory have not changed
and the equipment is fully serviceable.
The measured values marked with
?
in Chapter 10 "Checks with high voltage" shall be
entered in the "start-up" column in the test certificate provided.
The service PC is required only for programming according to:
•
Chapter 10 "Checks with high voltage"
•
Chapter 11 "Start-up and functional test of the IONTOMAT"
Programming the "Correction curve"
Setting the "sensitivity" (film density)
Setting the "sensitivity correction" (adaption to different exposure techniques)
•
Chapter 12 "Further programming"
•
Description of the Service-PC syntax is found in Chapter 20 "Appendix".
Checking and recording for the area of application of the X-ray
decree (§16 Germany)
1
In the area of application of the X-ray decree, an acceptance test certificate is supplied,
with most of the data filled in by the factory.
Only:
•
the cut-off dose
•
the resolution of the film/screen systems used
•
the output values of the constancy test
must be determined by the owner of the equipment and recorded in the acceptance test
certificate. Furthermore, the front page of the acceptance test certificate must also be
completed with the operator´s data.
If the generator is switched off with the Service PC connected,
wait approximately 5 s before switching it on again.
NOTICE