Mammomat 1000/3000
Register 3
SP B7-230.033.07
Page 4 of 6
Siemens-Elema AB
Installation and Start-Up
Rev. 03
11.99
SPS-UD
Solna, Sweden
4 - 4
Installing the generator and the stand
Laying the cable harness
4
1.
Separate the cable harness.
2.
Lay the stand cable harness in the cable duct, as shown in Fig. 4, all the way to the
generator.
3.
Fit the cable duct covers (6) onto the cable ducts.
The cable harness consists of four shielded cables, see Fig. 4.
Remove the transport safeguards which consist of cable ties
(four around the cable harness and one at the end of each
shielded cable).
Fig. 4
Laying the cable harness
Pos in Fig. 4
Description
1
High voltage cable H1
2
IONTOMAT signal cables X10 and X11
Unit control cable X1
Power supply cable X14
3
Anode rotation cable X9
Filament cable X8
4
Mains supply cables L1, L2
Protective ground
5
Decompression-button cable (only with separate control console)
NOTICE
MAM00092
1
2
3
4
6
2
1
3
4
5
MAM00215