“Test the Crossing” Test Mode;
Preemption Output de-energizes
•
Activation of the warning devices occurs simultaneously (no advance preempt time).
Table 6-5 SSCC Operational Tests
Step 1
Verify that the light/gate battery is charged.
Step 2
Verify that all connectors on the SSCC have been properly
positioned, seated, and secured.
Step 3
Verify that all the electrical connections in the Bell, Lamp, and
Gate circuits are properly assembled, tightened, and secured.
Step 4
Verify that all flashing lamps light and none are burned out.
Step 5
Verify that all lights have been aligned.
Step 6
Verify that the gates are properly adjusted and operational.
Step 7
Verify that the bells are operational.
Step 8
Verify that all SSCC programming is correct (program and
configure menus).
Step 9
Verify that all lamp voltages have been set.
Step 10
Momentarily turn on the flashers from the Test menu and
verify that the battery charger is operational and providing
current to the lamps and battery.
Step 11
Verify that the gate delay time is correct.
Step 12
Verify that the lights continue to flash while the gates are
rising.