
SSCC APPLICATIONS & PROGRAMMING GUIDELINES
_________________________________________________________________________________________________________
4-11
SIG-00-22-02 JUNE 2022 (Revised September 2022)
Version: B.1
4.5 Installation
4.5.1 Crossing Controller Module Installation
Two non-redundant A80405 Solid-State Crossing Controller IIIi (SSCC IIIi) modules can be
installed in the GCP5000 (GCE) as shown in Figure 4-7. Crossing Controller lamp and bell
circuit wiring include:
•
Installation of wiring between the GCP5000 (GCE) Crossing Controller connectors
and the SSCC III Lighting Surge Panels
•
Installation of underground wiring between the SSCC III Lighting Surge Panels and
the crossing Mast Junction Boxes
•
Use of SSCC III Lighting Surge Panel(s)
Where one signal is controlled by each Controller Module, one surge panel may be used for
both modules as shown in Figure 4-8.
WARNING
WHEN ONE FLASHING LIGHT SIGNAL IS CONTROLLED BY EACH
SSCC MODULE, A SINGLE SURGE PANEL MAY BE USED AS
SHOWN IN FIGURE 4-8. JUMPER LINKS FROM A TO B MUST BE
REMOVED IN TWO PLACES.
WHERE TWO SIGNALS ARE CONTROLLED BY A SINGLE
CROSSING CONTROLLER MODULE, ONE SURGE PANEL MAY BE
USED AS SHOWN IN FIGURE 4-9
NOTE
Where multiple signals are controlled by each Crossing Controller
Module, an additional –2 surge panel is required and is wired and jumper
links installed similar to Figure 4-9, but connected to the second SSCC
module connector.