4
Commissioning
Prerequisites
To commission the units, the following working steps must be carried out:
•
Prerequisite is the correct mounting and correct electrical installation and, in the case
of wireless products, correctly working radio connections to all required auxiliary units
•
Make all plant-specific settings. Special attention must be paid to menu
"Configuration". For that purpose, the relevant operating level is to be selected as
follows:
Press the OK button on the room unit to switch to programming.
Press the info button for at least 3 seconds and select operating level
"Commissioning" with the setting knob. Then, press the OK button.
•
Make the function check as described below
•
Reset the attenuated outside temperature
(menu "Diagnostics of consumers", operating line "Outside temp attenuated" (8703))
Function check
To facilitate commissioning and fault tracing, the controller can be used to make input
and output tests. With these tests, the controller’s inputs and outputs can be checked.
To make the tests, switch to menu "Input / output test" and go through all available
setting lines.
If faults occurred during the tests, please refer to the descriptions "Diagnostics of heat
and refrigeration sources" and "Diagnostics of consumers" in this User Manual.
Operating state
The current operating state can be checked on menu "State".
Diagnosis
For detailed diagnostics of the plant, check menus "Diagnostics heat generation" and
"Diagnostics consumers".
4.1 Heat pump controller
Checking the LEDs
LED off:
No power supply
LED on
Ready
LED blinks
Local fault
235
9Z
3
3
LED
36/258
Siemens Switzerland Ltd
User manual RVS61.843, RVS41.813
CE1U2355en_02
HVAC Products
4 Commissioning