7SR224 Argus Commissioning & Maintenance Guide
©2010 Siemens Protection Devices Limited
Chapter 6 Page 55 of 73
3.2
Voltage Transformer Supervision (60VTS)
7SR224
46
BC
46
NPS
(x2)
37
(x2)
49
50
BF
51V
V
L1
(V
A
)
V
L2
(V
B
)
V
L3
(V
C
)
V
4
(V
X
)
I
L1
(I
A
)
81
HBL
2
37
(x2)
49
50
BF
51V
I
L2
(I
B
)
81
HBL
2
37
(x2)
49
50
BF
51V
I
L3
(I
C
)
81
HBL
2
60
CTS
60
VTS
I
4
(I
G
/I
SEF
)
74
TCS
(x3)
NOTE: The use of some
functions are mutually exclusive
67/
50
(x4)
67/
51
(x4)
67/
50
(x4)
67/
50
(x4)
67/
51
(x4)
67/
51
(x4)
64
H
27
59
27
59
(x4)
27
59
(x4)
27
59
(x4)
47
(x2)
79
59N
(x2)
Note:
Example shows
Voltage Config =
Van, Vbn, Vcn
81
(x4)
67/
50G
(x4)
67/
51G
(x4)
67/
50S
(x4)
67/
51S
(x4)
27S
59S
27S
59S
27S
59S
Batt
Test
Cap.
Test
Figure 3-2
Voltage Transformer Supervision
Voltage Inputs:
V
L1
(V
A
), V
L2
(V
B
), V
L3
(V
C
)
Current Inputs:
I
L1
(I
A
), I
L2
(I
B
), I
L3
(I
C
),
Disable:
27, 47, 59N
Map Pickup LED:
60VTS - Self Reset
3.2.1 1 or 2 Phase VT fail
Apply 3P balanced nominal current and voltage. Reduce 1 phase voltage until VTS operates, record voltage
reduction level.
60VTS V Setting
Setting x 3
Measured Voltage Reduction
Increase the voltage until VTS resets. Increase current on 1 phase by 110% of 3x the
60VTS I
setting. Reduce
voltage as above and check for no operation. Return voltage to nominal. Increase current on 1 phase by 90% of
3x the
60VTS I
setting. Reduce voltage as above and check for VTS operation
60VTS I Setting
Setting x 3
110% of Setting x 3
90% of Setting x 3
No VTS
□
VTS
operation
□