87
(11) Connect the three cables from the main
FLD-1 unit to the indicated connectors.
(12) Slide the pump unit into the FLD-1 unit and
fasten it in place.
Note: Push the knobs in until they click into
place.
(13) Connect the tube connectors on the tubes
from the dust unit to the tubes from the pump
unit.
Note: Connect the marked tubes together and
the unmarked tubes together.
(14) Attach the pump cover.
Note: Push the knobs in until they click into
place.
FLD-1
main unit
Tube marking
Tube marking
Dust unit