
12
Breaker status
Not used.
RH
Running hours.
RPM
Engine speed.
Current process timer
Process content and remaining execution time.
Measurement Screens
○
Generator
Status Screen
Contents
L1N (V)
U-N voltage
L2N (V)
W-N voltage
L1L2 (V)
U-W voltage
Generator Freq (Hz)
Frequency
○
Generator Current
Status Screen
Contents
L1 (A)
U phase current
L2 (A)
W phase current
○
Analog Inputs
Status Screen
Contents
Fuel Level (gal)
Fuel amount
BatteryVoltage (V)
Battery voltage
○
Binary Inputs
Status Screen
Contents
1 Remote Start/Stop
Remote start terminal is closed and the value is
“1”
2 Terminal Cover Open
The value is “1” while the terminal cover is open
3 Spill Containment Fluid
Level Check
If the spill containment is filled with liquid, the value is “1”
4 Air Filter Clogging Up
If the Air Filter is clogged, the value is “1”
○
Binary Outputs
Status Screen
Contents
1 BREAKER SHT
During BREAKER shunt, the value is “1”
2 ACC
During ACC output, the value is “1”
3 Starter
During cranking, the value is “1”
4 ECM Power
During ECM Power output, the value is “1”
7 OverSpeed
During OveerSpeed, the value is “1”
○
Generator Power
Status Screen
Contents
L1 (kW), (PF), (kVA)
U-phase active power, power factor, apparent power
L2 (kW), (PF), (kVA)
U-phase active power, power factor, apparent power
Σ
(kW), (PF), (kVA)
Total active power, power factor, apparent power
Содержание DGK20FS
Страница 2: ......
Страница 12: ...9 4 2 Operation Panel Configuration Circuit Breaker Controller Voltage Regulator Power Switch 1 4 3 2...
Страница 51: ...48 13 Circuit Diagram...
Страница 52: ...2022 2021...