www.weg.net
Manual of Electric Motors
72
E
N
G
LI
S
H
3. Install the second pair of eyebolts, as shown in Figure 4.17;
4. Reduce the load on the first pair of eyebolts for rotating the motor, as shown in Figure 4.18. This procedure
must be carried out slowly and carefully;
5. Remove the first pair of eyebolts, as shown in Figure 4.19.
Figure 4.16 -
Install the first pair of eyebolts
Figure 4.17 -
Install the second pair of eyebolts
Figure 4.18 -
Motor is being rotated to horizontal position
Figure 4.19 -
Final result: motor placed in horizontal position
1. Ensure that all eyebolts are tightened properly, as shown in Figure 4.1;
2. Install the first pair of eyebolts and lift the motor as shown in Figure 4.16;
Page 143
Содержание BN 5-12 Series
Страница 13: ...TAB 1 DEVICE DATA SHEETS ...
Страница 18: ...TAB 2 APPROVED SUBMITTAL ...
Страница 23: ...All data subject to change without notice 1 800 ASK 4WEG www weg net 14 ...
Страница 26: ...Your advantages our pumps ...
Страница 45: ...ADV 2 13E And what can we get flowing for you Your nearest contact Or visit www seepex com ...
Страница 117: ...TAB 3 INSTALLATION OPERATIONS AND MAINTENANCE ...
Страница 133: ...Page 37 ...
Страница 233: ...www weg net Manual of Electric Motors 64 ENGLISH Figure 2 1 IEC motor nameplate Page 135 ...
Страница 234: ...www weg net Manual of Electric Motors 65 ENGLISH Figure 2 2 NEMA motor nameplate Page 136 ...
Страница 306: ...TAB 4 AS BUILTS AND SUPPLEMENTAL INFORMATION ...
Страница 307: ...R Page 29 ...
Страница 308: ...R Page 30 ...