Engineering: JC/GS/JP
Page 4 of 4
Data
Sheet
835294-835296
Page
4
Seismic calculations provided under separate informational submittal.
anchor bolts Hilti HAS-R 316 ¾”x9-5/8” anchor rod (2045010), quantity 6 (each pump).
Seal flush parts to be supplied loose: (installed in the field by contractor)
Qty.
Qty. per pump
Part no.
Description
Manufacturer
9
3
1839-005
True union 2000 industrial ball
valve, PVC, Viton elastomers, ½”
socket
Spears
3
1
8210G007 120/60
Solenoid valve, 2W, NC, brass
body, 120/60 AC, ½”NPT, 300psi
ASCO
3
1
BVO-6116
Flowmeter with N/O switch, brass
body, NBR elastomers, glass
tube, 1-5 GPM range, ½”NPT
fittings
Kobold
1
1 for all 3 pumps D83SS-40-04-LA130
gauge, pressure, 0-200 PSI,
glycerin filled, SS casing, 4" dia
face, 1/2"MNPT lower mount
Trerice
3
1
5304K9
Hose with brass 3/8" Male x
Female, 3/8" ID, 300 PSI, 12” long
McMaster Carr
Provide 316ss pump tags mounted to pump; tags to read commission no., tag no., type, date of
manuf., capacity, job no., TDH, speed.
TAG#'s:
“15LPMP810” - pos. 3
“15LPMP820” - pos. 3
“15LPMP830” - pos. 2
Concentric reducer, Proco style RC expansion joint, single filled arch, flanges drilled to ANSI 125/150#,
Viton elastomer, stainless steel hardware (per quote #239128):
Location Qty.
Part
no.
Description
Manufacturer
Suction
3
EJRCFA151/VV
4" ID X 3" ID X 6" F/F - RCFA-151/VV VITON
TUBE AND COV ER
Proco
Suction
3
RNG4810300
SET, #481 150# RETAINING RINGS
Proco
Testing:
-Hydrostatic per FO.QA.25e
-Performance test per FO.QA.42e with 5 recorded test points from shutoff head to 125% of maximum
design capacity.
-Certified pump curves showing head vs. flow, bhp, efficiency, and NPSH curves. NPSH required shall
be at least 5 feet of water absolute greater than NPSH available.
-Certification that the pump hp demand will not exceed the rated motor hp beyond the 1.0 service
rating at any point on the curve.
-Written acceptance of test results is required before shipment.
Page 28
Содержание BN 5-12 Series
Страница 13: ...TAB 1 DEVICE DATA SHEETS ...
Страница 18: ...TAB 2 APPROVED SUBMITTAL ...
Страница 23: ...All data subject to change without notice 1 800 ASK 4WEG www weg net 14 ...
Страница 26: ...Your advantages our pumps ...
Страница 45: ...ADV 2 13E And what can we get flowing for you Your nearest contact Or visit www seepex com ...
Страница 117: ...TAB 3 INSTALLATION OPERATIONS AND MAINTENANCE ...
Страница 133: ...Page 37 ...
Страница 233: ...www weg net Manual of Electric Motors 64 ENGLISH Figure 2 1 IEC motor nameplate Page 135 ...
Страница 234: ...www weg net Manual of Electric Motors 65 ENGLISH Figure 2 2 NEMA motor nameplate Page 136 ...
Страница 306: ...TAB 4 AS BUILTS AND SUPPLEMENTAL INFORMATION ...
Страница 307: ...R Page 29 ...
Страница 308: ...R Page 30 ...