Maintenance Schedule
SEEPEX
, Inc.
511 Speedway Dr.
Enon, OH 45323
Phone (937) 864-7150
Fax (937) 864-7157
www.seepex.com
Item Action Frequency
Remarks
Packing
Check leakage rate and tighten / loosen to allow 1-6
drops per minute
Weekly
-Adjust packing gland
nuts ½ turn per minute
until stablized
Flushing
Fluid
Check flow and pressure
Weekly
Pump
Performance
Check flow and pressure
Weekly
-Replace stator/rotor as
required
-adjust retensioning
segments if equipped
Bearings
Check end play and temperature / change grease
per lubrication schedule
Monthly
-See lubrication
schedule
Pump
Universal
Joints
Check seal intergrity / replace bushings and joints
as needed / change grease per lubrication schedule
Rotor replacement
or 10,000
operating hours
(whichever is first)
-See lubrication
schedule
Motor
Check RPM / amperage
Check fan cover for obstructions
Monthly
-Verify performance
from inital data
-remove obstructions
Gear
Reducer
Check oil level / temperature
Monthly
-See lubrication
schedule
Page 211
Содержание BN 5-12 Series
Страница 13: ...TAB 1 DEVICE DATA SHEETS ...
Страница 18: ...TAB 2 APPROVED SUBMITTAL ...
Страница 23: ...All data subject to change without notice 1 800 ASK 4WEG www weg net 14 ...
Страница 26: ...Your advantages our pumps ...
Страница 45: ...ADV 2 13E And what can we get flowing for you Your nearest contact Or visit www seepex com ...
Страница 117: ...TAB 3 INSTALLATION OPERATIONS AND MAINTENANCE ...
Страница 133: ...Page 37 ...
Страница 233: ...www weg net Manual of Electric Motors 64 ENGLISH Figure 2 1 IEC motor nameplate Page 135 ...
Страница 234: ...www weg net Manual of Electric Motors 65 ENGLISH Figure 2 2 NEMA motor nameplate Page 136 ...
Страница 306: ...TAB 4 AS BUILTS AND SUPPLEMENTAL INFORMATION ...
Страница 307: ...R Page 29 ...
Страница 308: ...R Page 30 ...