Regency GF950L-2 Gas Fireplace
3
table of contents
Copy of Data Badge ......................................................5
Unit Dimensions ............................................................6
Installation ....................................................................7
Important Message ......................................................7
General Safety Information ............................................7
Installation Checklist ......................................................8
Locating Your Gas Fireplace ..........................................8
Clearances ....................................................................9
Framing Dimensions ....................................................10
Combustible Finishing
Unit Assembly/ Finishing/ Mantel Clea Mantel Leg
Clearances ..................................................................11
Installation Access Panel .............................................11
Framing & Finishing (Combustible)..............................12
Combustible Requirements .........................................12
Clearances for Combustible Finishing with Mantel ......13
Combustible Mantel Leg Clearances ...........................13
Non-Combustible Flushed Finishing
Unit Assembly/ Finishing/ Mantel Clearances
+ Mantel Leg Clearances .....................................14
Remove Top Nailing Strips & Standoffs ...............14
Installation Access Panel .....................................14
Clearances for Non-Combustible Flushed Finishing with
Mantel ..........................................................................15
Non-Combustible Mantel Leg Clearances ...................15
Flushed Finishing & Framing with Non-Combustible
Material ........................................................................16
Non-Combustible Requirements..................................16
Installing a TV / Artwork Flush with the Unit ................17
Installing a TV / Artwork Enclosed above the Unit .......18
Optional Framing Kit ....................................................19
Non-Combustible Facing Installation ...........................20
Framing & Finishing (Clean Finish Installations Only) .21
Flue Restrictor Position ...............................................22
Natural Flue ...........................................................23-36
Exterior Flue Termination Locations ............................23
Clearances ..................................................................24
102mmx168mm Rigid Pipe Cross Reference Chart 25-26
Flueing Introduction (Non Power Flue) ........................27
Flueing Arrangement for Horizontal Terminations .......27
Flueing Arrangements - Horizontal Termination (Flex) 28
Horizontal Terminations-Rigid Pipe 102mmx168mm 29-30
Flueing Arrangement for Vertical Terminations
-Vertical Flueing with Two Elbows ..............................31
Direct Flue Wero Clearance Top Exit Vertical Flue Kit .32
Vertical Termination - Vertical Flex Flue Kit .................33
Vertical Flue Extension Kit ...........................................34
Ceiling Firestop / Firestop Spacer ...............................34
Vertical terminations - Rigid Pipe 102mm x 168mm ....35
Wiring Diagram - Non Power Flue ...............................36
Inline Power Flue ..................................................37-57
Exterior Flue Termination Locations ............................37
Clearances ..................................................................38
Flueing Introduction .....................................................39
Flue Arrangements for Horizontal Terminations
-Inline Horizontal Flue Chart ......................................39
Flue Restrictor Position ...............................................39
Horizontal Terminations - Inline Power Flue
102mm x 168mm Flex Flue .......................................40
Unit Installation with Horizontal Termination 102 mm x
168 mm Flueing (Flex Flue Systems) ..........................41
AstroCap Dimensions ..................................................41
Horizontal Terminations - Inline Power Flue
Rigid Pipe 102 mm x 168 mm .....................................42
Unit Installation with Horizontal Termination 102 mm x
168 mm Flueing (Rigid Flue Systems) ........................43
Flueing Arrangement for Vertical Terminations - Inline
Power Flue ...................................................................44
Vertical Inline Power Flue Terminations - Flex Pipe 45-46
Vertical Flue Extension Kit-Horizontal Power Flue Kit .47
Ceiling Firestop / Firestop Spacer ...............................47
Vertical Inline Power Flue Terminations - Rigid Pipe ...48
Bypass Adjustment ......................................................50
Inline Power Flue Dimensions .....................................51
Gas Power Flue Installation - Framing
Inline Power Flue Terminations ....................................52
Power Flue Terminal Installation - Inline Power Flue
Terminations ................................................................53
Gas Power Flue Installation Clearance Requirements
Inline Power Flue Terminations ....................................54
Natural Flue to Power Flue Conversion .......................55
Wiring Diagram - Power Flue .......................................57
End of Line Power Flue ........................................58-76
Exterior Flue Termination Locations ............................58
Clearances ..................................................................59
Flueing Introduction .....................................................60
Flueing Arrangements for Horizontal Terminations -
End of Line Horizontal Power Flue Chart ....................60
Flue Restrictor Position ...............................................60
Unit Installation with Horizontal Terminations - End of
Line Power Flue 102 mm x 168 mm Flex Flueing ........61
Horizontal Terminations - End of Line Power Flue
Rigid Pipe 102 mm x 168 mm .....................................62
Unit Installation with Horizontal Terminations - End of
Line Power Flue 102 mm x 168 mm Rigid Flueing ......63
Gas Power Flue Installation - Wiring -
End of Line Power Flue ...............................................64
System Data ................................................................65
High Elevation ..............................................................65
Gas Line Installation ....................................................65
Pilot Adjustment ...........................................................65
Gas Pipe Pressure Testing ..........................................65
845 S.I.T. Valve Description .........................................66
Aeration Adjustment ....................................................66
Optional Fan Ducting Kit Installation ............................67
Optional Fan Kit Installation .........................................68
Fan Duct Extension Kit Installation ..............................69
Wiring Diagram ............................................................69
Log Set Installation ......................................................70
Front Trim Removal / Installation .................................72
Содержание Greenfire GF950L Series
Страница 93: ...Regency GF950L 2 Gas Fireplace 93 NOTES notes ...
Страница 100: ......
Страница 101: ...Regency GF950L 2 Gas Fireplace 101 NOTES notes ...
Страница 102: ...102 Regency GF950L 2 Gas Fireplace NOTES notes ...
Страница 103: ......