ABL77 Service Manual
Chapter 7: Re-Assembly
Valve Boards – General Information,
Continued
Y-cable
installation
(continued)
Step Action
5.
Connect the waste pump cable to the Y-cable connector with the blue
and green wires. Match the polarity of the cables by connecting the
blue and green wires of the Y-cable with the same color wires of the
waste pump cable.
6.
Disconnect the cable connector of valve L3 from J7 of the valve board
in the lower right-hand corner.
7.
Route the L3 valve cable under the L1 valve cable and across the
board, as shown.
8.
Connect the L3 valve cable connector to the Y-cable connector with
the
red
wires. No polarity match is required with this cable.
Completed
module diagram
Figure 7-7
Continued on next page
Rev. F
7-17
Содержание ABL 77 Series
Страница 19: ...Chapter 2 Analyzer Description ABL77 Service Manual This page intentionally left blank 2 4 Rev F ...
Страница 26: ...ABL77 Service Manual Chapter 2 Analyzer Description This page intentionally left blank Rev F 2 11 ...
Страница 40: ...ABL77 Service Manual Chapter 2 Analyzer Description This page intentionally left blank Rev F 2 25 ...
Страница 227: ...Chapter 6 Replacements ABL77 Service Manual This page intentionally left blank 6 32 Rev F ...
Страница 333: ...ABL77 Service Manual Chapter 9 Spare Parts Modules and Externals Continued Module diagrams continued Rev F 9 3 ...
Страница 335: ...ABL77 Service Manual Chapter 9 Spare Parts Upper Module Components Continued Upper module component diagram Rev F 9 5 ...
Страница 344: ...Chapter 9 Spare Parts ABL77 Service Manual This page intentionally left blank 9 14 Rev F ...