ABL77 Service Manual
Chapter 6: Replacements
A/D Cable – Analog Board to Battery Control Board,
Continued
Introduction
(continued)
Step Action
7.
Connect the new A/D cable (item
1
in figure 6-32) to the left rear of
the battery control board.
8.
Re-install the electronics shelf with four 5/64” Allen screws.
9.
Re-install the Ethernet cable (636-438) into the white connector in the
upper right corner of the CPU.
10.
Re-install the COM1 cable (636-445) into the connector on the front
right of the CPU with the red strip on the right. Pull excess cable out
between the interface board and the cable connector so the cable lays
flat on the CPU.
11.
Assure all cables lie flat on top of the CPU.
12.
Re-install the analog board into the electronics module.
13.
Re-assembly the analyzer starting with the electronics module.
Figure 6-32
Rev. F
6-51
Содержание ABL 77 Series
Страница 19: ...Chapter 2 Analyzer Description ABL77 Service Manual This page intentionally left blank 2 4 Rev F ...
Страница 26: ...ABL77 Service Manual Chapter 2 Analyzer Description This page intentionally left blank Rev F 2 11 ...
Страница 40: ...ABL77 Service Manual Chapter 2 Analyzer Description This page intentionally left blank Rev F 2 25 ...
Страница 227: ...Chapter 6 Replacements ABL77 Service Manual This page intentionally left blank 6 32 Rev F ...
Страница 333: ...ABL77 Service Manual Chapter 9 Spare Parts Modules and Externals Continued Module diagrams continued Rev F 9 3 ...
Страница 335: ...ABL77 Service Manual Chapter 9 Spare Parts Upper Module Components Continued Upper module component diagram Rev F 9 5 ...
Страница 344: ...Chapter 9 Spare Parts ABL77 Service Manual This page intentionally left blank 9 14 Rev F ...