Chapter 5: Management with the CLU
141
10. Optional. If you want to increase capacity, highlight
Capacity
, press the
backspace key to erase the current logical drive capacity and type in the new
value.
The new value must be equal or larger than the current capacity.
11. Highlight
Save Logical Drive
and press Enter.
The screen returns to Disk Array Migration Logical Drives.
12. Highlight
Complete Disk Array Migration
and press Enter.
13. In the confirmation message, press Y to confirm.
The screen jumps to Disk Arrays Summary.
Running PDM
Be sure PDM must be enabled. See “Enabling PDM on a Disk Array” on
page 139.
To run Predictive Data Migration on a disk array:
1.
From the Main Menu, highlight
Disk Array Management
and press Enter.
2.
Highlight the disk array you want and press Enter.
3.
Highlight
Background Activities
and press Enter.
4.
Highlight
Predictive Data Migration
and press Enter.
5.
Specify the source and target physical drives.
6.
Highlight
Start
and press Enter.
Running Transition on a Disk Array
Transition is the process of replacing a revertible spare drive that is currently part
of a disk array with an unconfigured physical drive or a non-revertible spare drive.
For more information, see “Transition” on page 210.
In order to run Transition:
•
The spare drive must be Revertible.
•
You must have an unconfigured physical drive of the same or larger capacity
to replace the spare drive.
To run Transition on a disk array:
1.
From the Main Menu, highlight
Disk Array Management
and press Enter.
2.
Highlight the disk array you want and press Enter.
3.
Highlight
Background Activities
and press Enter.
4.
Highlight
Transition
and press Enter.
5.
Specify the source and target physical drives.
6.
Highlight
Start
and press Enter.
Содержание VTRAK M610p
Страница 1: ...VTRAK M610p Product Manual Version 1 0 ...
Страница 30: ...VTrak M610p Product Manual 18 ...
Страница 44: ...VTrak M610p Product Manual 32 ...
Страница 47: ...Chapter 4 Management with WebPAM PROe 35 Figure 1 The WebPAM PROe log in screen ...
Страница 128: ...VTrak M610p Product Manual 116 ...
Страница 184: ...VTrak M610p Product Manual 172 Shutdown complete It is now safe to power off the subsystem ...
Страница 274: ...VTrak M610p Product Manual 262 ...