Chapter 4: Management with WebPAM PROe
101
11. Click the
Update
button.
The logical drive changes to reflect your choices.
12. Update other logical drives using the same method.
13. When you are done making the changes, click the
Next
button.
14. Click the
Submit
button to begin Migration.
To set Migration priority, see “Making Background Activity Settings” on page 47.
Rebuilding a Disk Array
When you rebuild a disk array, you are actually rebuilding the data on a
replacement physical drive.
Rebuilding Automatically
Normally, a disk array would rebuild itself using a hot disk drive, after going
Critical. However, if the Auto Rebuild function is disabled or no spare drives are
available, you must initiate the procedure.
To enable Auto Rebuild, see “Making Background Activity Settings” on page 47.
To create a spare drive, see “Creating a Spare Drive” on page 112.
For more information, see “Hot Spare Drive(s)” on page 205.
Rebuilding Manually
If a physical drive has failed, identify and replace the drive, then rebuild the disk
array as described below:
1.
Click the Subsystem
icon in Tree View.
2.
Click the Disk Arrays
icon.
3.
Click the Disk Array
icon.
If there are multiple disk arrays, choose the icon with the yellow !.
4.
From the dropdown menu the Background Activity tab, select
Start Rebuild
.
5.
Select the Source physical drive.
This is a remaining functional physical drive in the disk array.
6.
Select the Target physical drive.
This is the replacement physical drive.
7.
Click the
Submit
button.
The Disk Array Background Activity tab shows the rebuild progress on the
replacement (target) physical drive. Depending the size of the physical disk
involved, this process will take some time.
Содержание VTRAK M610p
Страница 1: ...VTRAK M610p Product Manual Version 1 0 ...
Страница 30: ...VTrak M610p Product Manual 18 ...
Страница 44: ...VTrak M610p Product Manual 32 ...
Страница 47: ...Chapter 4 Management with WebPAM PROe 35 Figure 1 The WebPAM PROe log in screen ...
Страница 128: ...VTrak M610p Product Manual 116 ...
Страница 184: ...VTrak M610p Product Manual 172 Shutdown complete It is now safe to power off the subsystem ...
Страница 274: ...VTrak M610p Product Manual 262 ...