VTrak M610p Product Manual
108
because there may be residual data the logical drives left behind from earlier
configurations. For this reason, Initialization is recommended for all new logical
drives.
Initialize a Logical Drive:
1.
Click the Subsystem
icon in Tree View.
2.
Click the Logical Drive Summary
icon.
3.
Click the
icon of the logical drive you want to Initialize.
You can also start Initialization from the Subsystem
icon Background
Activities tab
4.
Click the Background Activities tab in Management View.
5.
From the Background Activities dropdown menu, select
Initialization
.
6.
To select Quick Initialization, check the box.
If you checked the box, enter a value in the Quick Initialization Size field.
This value is the size of the initialization blocks in MB.
7.
If you did not select Quick Initialization, enter a hexidecimal value in the
Initialization Pattern in Hex field or use the default 00000000 value.
8.
Click the
Submit
button.
9.
In the confirmation box, type the word
confirm
in the field provided.
10. Click the
OK
button.
To view the progress of the Initialization, click the Background Activity tab.
To set Initialization priority, see “Making Background Activity Settings” on
page 47.
Running Redundancy Check
Redundancy Check is a routine maintenance procedure for fault-tolerant logical
drives (those with redundancy) that ensures all the data matches exactly.
Redundancy Check can also correct inconsistencies. You can also schedule a
Redundancy Check. See “Scheduling an Activity” on page 49.
Redundancy Check a Logical Drive:
1.
Click the Subsystem
icon in Tree View.
2.
Click the Logical Drive Summary
icon.
Caution
When you initialize a logical drive, all the data the logical drive will
be lost. Backup any important data before you initialize a logical
drive.
Содержание VTRAK M610p
Страница 1: ...VTRAK M610p Product Manual Version 1 0 ...
Страница 30: ...VTrak M610p Product Manual 18 ...
Страница 44: ...VTrak M610p Product Manual 32 ...
Страница 47: ...Chapter 4 Management with WebPAM PROe 35 Figure 1 The WebPAM PROe log in screen ...
Страница 128: ...VTrak M610p Product Manual 116 ...
Страница 184: ...VTrak M610p Product Manual 172 Shutdown complete It is now safe to power off the subsystem ...
Страница 274: ...VTrak M610p Product Manual 262 ...