VTrak M610p Product Manual
128
4.
Highlight the Temperature Warning threshold you want to change.
5.
Press the backspace key to erase the current value.
6.
Type a new interval value in degrees C.
7.
Press Ctrl-A to save your settings.
Checking the Batteries
This feature enables you monitor and recondition the subsystem battery or
batteries.
1.
From the Main Menu, highlight
Subsystem Management
and press Enter.
2.
Highlight
Enclosure Management
and press Enter.
3.
Highlight
Batteries
and press Enter.
4.
Highlight the battery you want to monitor and press Enter.
Battery Notes
Each battery works with a controller. If the battery is present in the subsystem but
the corresponding controller is not present, the battery will not appear in the
interface.
If a battery does not reflect normal conditions and it is not currently under
reconditioning, run the Recondition function before you replace the battery. See
“Reconditioning a Battery” on page 128.
If a battery reaches the threshold temperature while charging or discharging, the
charge or discharge pauses and the blower runs at high speed until the battery
temperature falls below the threshold.
If the battery does not maintain normal values after a Recondition, replace the
battery. See “Replacing a Cache Battery” on page 184.
VTrak automatically reconditions the battery every two months.
When you install a new battery, the cycle count shows 0. VTrak automatically
runs a recondition on the battery to verify it. If you restart the subsystem or
controller before reconditioning is finished, the battery is charged to 100%, then
reconditioning starts again.
Reconditioning a Battery
To recondition the subsystem battery:
1.
From the Main Menu, highlight
Subsystem Management
and press Enter.
2.
Highlight
Enclosure Management
and press Enter.
3.
Highlight
Batteries
and press Enter.
4.
Highlight the battery you want to monitor and press Enter.
Содержание VTRAK M610p
Страница 1: ...VTRAK M610p Product Manual Version 1 0 ...
Страница 30: ...VTrak M610p Product Manual 18 ...
Страница 44: ...VTrak M610p Product Manual 32 ...
Страница 47: ...Chapter 4 Management with WebPAM PROe 35 Figure 1 The WebPAM PROe log in screen ...
Страница 128: ...VTrak M610p Product Manual 116 ...
Страница 184: ...VTrak M610p Product Manual 172 Shutdown complete It is now safe to power off the subsystem ...
Страница 274: ...VTrak M610p Product Manual 262 ...