6.42
9850064 R03 - 2021 650 / 850 Matryx Trail Performance / Crossover Snowmobile Service Manual
© Copyright Polaris Inc.
9. Route and reconnect the brake switch wire connector
y
.
10. Rewrap the harness covering
u
to cover the brake
switch connector.
11. Install new crush washers on the banjo bolt and
install into master cylinder.
12. Orient the brake hose fitting as shown. Torque banjo
bolt
i
to specification.
TORQUE
Brake Line Banjo Bolt:
240-260 in-lbs (27-30 N·m)
13. Add new DOT 4 brake fluid to the reservoir. Perform
the brake bleeding procedure.
NOTICE
After filling with brake fluid and bleeding air out of
system, check all fluid joints with clean / dry shop rag to
determine if any leaks are present at master cylinder
assembly.