Analyzing Samples
8-32
Emergency Shutdown
If a situation arises where you have to shut down the system quickly and you do not have time to
carry out the correct procedure, you can use the procedure described below.
NOTE: This procedure is for use in an emergency only. Do not use it as a routine shutdown procedure.
1.
Press the
Emergency Red
button located on the upper left hand side of the instrument.
2.
When flame is extinguished, shut off gases at source and bleed.
3.
Switch off the spectrometer at the operational on/off switch on the front panel.
4.
If you were previously running concentrated salt solutions, organic solvents, or
solutions containing cyanide, copper, silver, or mercury proceed as follows to shut
down the system properly. Wait until the instrument cools down, then proceed as
follows:
•
Remove the burner head.
•
Pour a large quantity of deionized water slowly through the neck of the burner chamber
to thoroughly flush the chamber and the drain system.
•
Check the burner head.
•
If there are deposits along the slot, clean the burner head.
•
Reinstall the burner head.
Содержание aanalyst 200
Страница 1: ...AAnalyst 200 User s Guide ...
Страница 6: ......
Страница 7: ...Introduction 1 ...
Страница 8: ......
Страница 18: ...Introduction 1 12 ...
Страница 19: ...Safety Practices 2 ...
Страница 20: ......
Страница 44: ...Safety Practices 2 26 ...
Страница 45: ...Preparing Your Lab 3 ...
Страница 46: ......
Страница 52: ...Preparing Your Lab 3 8 473 mm 650 mm 910 mm 700 mm 760 mm 170 mm Figure 3 1 Outside dimensions of instrument ...
Страница 55: ...AAnalyst 200 User s Guide 3 11 Figure 3 3 Space requirements for the spectrometer system top view ...
Страница 66: ...Preparing Your Lab 3 22 ...
Страница 67: ...System Description 4 ...
Страница 68: ......
Страница 89: ...Installation 5 ...
Страница 90: ......
Страница 107: ...AAnalyst 200 User s Guide 5 19 Setting up the Burner System Figure 5 9 Full view of the AAnalyst 200 Instrument ...
Страница 115: ...Operation of the Instrument 6 ...
Страница 116: ......
Страница 126: ...Operation of the Instrument 6 12 Installing the Burner Mount Assembly Figure 6 6 Installing the burner mount assembly ...
Страница 132: ...Operation of the Instrument 6 18 Figure 6 9 Installing the lamp compartment cover ...
Страница 158: ...Operation of the Instrument 6 44 ...
Страница 159: ...Touch Screens 7 ...
Страница 160: ......
Страница 173: ...AAnalyst 200 User s Guide 7 15 Screen 7 10 Spectrometer Subpage Flame Technique ...
Страница 193: ...AAnalyst 200 User s Guide 7 35 Screen 7 22 Shortcut menu Properties folder appear and select Share this folder option ...
Страница 210: ...Touch Screens 7 52 ...
Страница 211: ...Analyzing Samples 8 ...
Страница 212: ......
Страница 220: ...Analyzing Samples 8 10 Screen 8 4 Display Calibration screen ...
Страница 231: ...AAnalyst 200 User s Guide 8 21 The results are displayed and printed Screen 8 12 Analyze page ...
Страница 244: ...Analyzing Samples 8 34 ...
Страница 245: ...Maintenance 9 ...
Страница 246: ......
Страница 268: ...Maintenance 9 24 Figure 9 6 Removing the burner assembly from the instrument ...
Страница 291: ...AAnalyst 200 User s Guide 9 47 Figure 9 15 Removing the E Box from the instrument ...
Страница 293: ...AAnalyst 200 User s Guide 9 49 Figure 9 16 Replacing the E Box ...
Страница 299: ...AAnalyst 200 User s Guide 9 55 Figure 9 20 The centering of the two lamp beams The alignment procedure is now complete ...
Страница 307: ...Troubleshooting 10 ...
Страница 308: ......
Страница 320: ...Troubleshooting 10 14 ...
Страница 321: ...Index ...
Страница 322: ......