Maintenance
9-30
5.
Before connecting the drain tube to the burner assembly, pour about 250 mL of water into the free
end of the drain tube to fill the drain loop and to activate the drain float.
6.
Place the hose clamp over the free end of the drain tubing.
7.
Carefully install the free end of the drain tubing over the drain outlet, making sure that the inner
lining of the drain tube does not get damaged.
8.
Use a flat-blade screwdriver to tighten the hose clamp.
9.
Plug the white drain interlock connector into the drain interlock plug on the burner assembly as
shown in the photograph below.
Further procedures for setting up the burner system are described in Chapter 6
, Operation of the
Instrument.
To install the burner head
1.
Put the burner head back onto the burner chamber while pressing the safety latch tab.
2.
Position the magnetic strip on the burner head ring around the back of the assembly – it should
face the ignitor box. Release the safety latch. Be sure the burner head is fully seated on the
chamber. A gentle twisting and pushing may be necessary. You will know that the burner head is
fully seated because the ignitor will swing over the burner.
3.
Put the burner assembly back into the instrument.
4.
Check the burner alignment. You should readjust the burner any time the burner is cleaned or the
burner head is replaced.
Installing AAnalyst Nebulizer
Install the AAnalyst nebulizer using the following procedure:
1.
Before you install the nebulizer, verify that the o-rings are in good condition. If an o-ring
appears damaged, replace it.
2.
Holding the nebulizer with one hand, remove the gas supply connector nut on the nebulizer
side arm and place it over the end of the NEB oxidant tubing.
3.
While holding the nebulizer firmly, gradually and carefully slide the (NEB) gas supply
tubing over the barbs on the nebulizer side arm.
NOTE: Carefully tilt the tubing up and down and rotate it while sliding it over the barbs.
WARNING
Warning: Flammable Gases – Fire and Explosion Hazard
The use of the wrong type of nebulizer for your burner system may result in a
seepage of fuel gas which is a serious fire hazard.
Use only the nebulizers specified for the burner system.
Содержание aanalyst 200
Страница 1: ...AAnalyst 200 User s Guide ...
Страница 6: ......
Страница 7: ...Introduction 1 ...
Страница 8: ......
Страница 18: ...Introduction 1 12 ...
Страница 19: ...Safety Practices 2 ...
Страница 20: ......
Страница 44: ...Safety Practices 2 26 ...
Страница 45: ...Preparing Your Lab 3 ...
Страница 46: ......
Страница 52: ...Preparing Your Lab 3 8 473 mm 650 mm 910 mm 700 mm 760 mm 170 mm Figure 3 1 Outside dimensions of instrument ...
Страница 55: ...AAnalyst 200 User s Guide 3 11 Figure 3 3 Space requirements for the spectrometer system top view ...
Страница 66: ...Preparing Your Lab 3 22 ...
Страница 67: ...System Description 4 ...
Страница 68: ......
Страница 89: ...Installation 5 ...
Страница 90: ......
Страница 107: ...AAnalyst 200 User s Guide 5 19 Setting up the Burner System Figure 5 9 Full view of the AAnalyst 200 Instrument ...
Страница 115: ...Operation of the Instrument 6 ...
Страница 116: ......
Страница 126: ...Operation of the Instrument 6 12 Installing the Burner Mount Assembly Figure 6 6 Installing the burner mount assembly ...
Страница 132: ...Operation of the Instrument 6 18 Figure 6 9 Installing the lamp compartment cover ...
Страница 158: ...Operation of the Instrument 6 44 ...
Страница 159: ...Touch Screens 7 ...
Страница 160: ......
Страница 173: ...AAnalyst 200 User s Guide 7 15 Screen 7 10 Spectrometer Subpage Flame Technique ...
Страница 193: ...AAnalyst 200 User s Guide 7 35 Screen 7 22 Shortcut menu Properties folder appear and select Share this folder option ...
Страница 210: ...Touch Screens 7 52 ...
Страница 211: ...Analyzing Samples 8 ...
Страница 212: ......
Страница 220: ...Analyzing Samples 8 10 Screen 8 4 Display Calibration screen ...
Страница 231: ...AAnalyst 200 User s Guide 8 21 The results are displayed and printed Screen 8 12 Analyze page ...
Страница 244: ...Analyzing Samples 8 34 ...
Страница 245: ...Maintenance 9 ...
Страница 246: ......
Страница 268: ...Maintenance 9 24 Figure 9 6 Removing the burner assembly from the instrument ...
Страница 291: ...AAnalyst 200 User s Guide 9 47 Figure 9 15 Removing the E Box from the instrument ...
Страница 293: ...AAnalyst 200 User s Guide 9 49 Figure 9 16 Replacing the E Box ...
Страница 299: ...AAnalyst 200 User s Guide 9 55 Figure 9 20 The centering of the two lamp beams The alignment procedure is now complete ...
Страница 307: ...Troubleshooting 10 ...
Страница 308: ......
Страница 320: ...Troubleshooting 10 14 ...
Страница 321: ...Index ...
Страница 322: ......