Maintenance
9-50
Maintaining the Acetylene Supply
WARNING
Warning: Acetylene – Explosion Hazard
Acetylene can decompose explosively at pressures higher than
103 kPa / 1.03 bar / 15 psig.
Always make sure that the acetylene outlet gauge pressure is below this value.
•
Depressurize both the fuel and oxidant gas hoses at the end of the working day or if you are
not going to use the instrument for an extended period. Close the cylinder valves to avoid the
possibility of gas hoses being subjected to the full cylinder pressure in the event that a
pressure regulator should fail.
•
Acetylene is supplied dissolved in a solvent such as acetone, and a small amount of solvent
carryover with the acetylene is normal. However, as tank pressure falls, the relative amount
of solvent entering the gas stream increases and can give erratic results, particularly for
elements such as calcium, tin, chromium, molybdenum and others whose sensitivity is highly
dependent on the fuel: oxidant ratio. The pressure drop is not linear with gas removal since
the acetylene is dissolved in a solvent, and a pressure of 600 kPa (6 bar; 85 psig) at ambient
temperature indicates that the cylinder is nearly empty. For this reason, replace acetylene
cylinders when the cylinder pressure drops to about 600 kPa (6 bar, 85 psig).
•
Always store and use acetylene cylinders vertically, rather than horizontally, to prevent
liquid acetone form reaching the cylinder valve.
•
The practice of ‘cracking the valve’ of an acetylene tank (that is, opening the valve slightly
for a very short period previous to attaching the regulator) is not recommended. While such
an action will clear the valve opening of dust or dirt particles and may remove acetone from
the cylinder valve, it is a potentially hazardous practice and one which should never be
attempted in the presence of an open flame, sparks or other possible sources of ignition.
Содержание aanalyst 200
Страница 1: ...AAnalyst 200 User s Guide ...
Страница 6: ......
Страница 7: ...Introduction 1 ...
Страница 8: ......
Страница 18: ...Introduction 1 12 ...
Страница 19: ...Safety Practices 2 ...
Страница 20: ......
Страница 44: ...Safety Practices 2 26 ...
Страница 45: ...Preparing Your Lab 3 ...
Страница 46: ......
Страница 52: ...Preparing Your Lab 3 8 473 mm 650 mm 910 mm 700 mm 760 mm 170 mm Figure 3 1 Outside dimensions of instrument ...
Страница 55: ...AAnalyst 200 User s Guide 3 11 Figure 3 3 Space requirements for the spectrometer system top view ...
Страница 66: ...Preparing Your Lab 3 22 ...
Страница 67: ...System Description 4 ...
Страница 68: ......
Страница 89: ...Installation 5 ...
Страница 90: ......
Страница 107: ...AAnalyst 200 User s Guide 5 19 Setting up the Burner System Figure 5 9 Full view of the AAnalyst 200 Instrument ...
Страница 115: ...Operation of the Instrument 6 ...
Страница 116: ......
Страница 126: ...Operation of the Instrument 6 12 Installing the Burner Mount Assembly Figure 6 6 Installing the burner mount assembly ...
Страница 132: ...Operation of the Instrument 6 18 Figure 6 9 Installing the lamp compartment cover ...
Страница 158: ...Operation of the Instrument 6 44 ...
Страница 159: ...Touch Screens 7 ...
Страница 160: ......
Страница 173: ...AAnalyst 200 User s Guide 7 15 Screen 7 10 Spectrometer Subpage Flame Technique ...
Страница 193: ...AAnalyst 200 User s Guide 7 35 Screen 7 22 Shortcut menu Properties folder appear and select Share this folder option ...
Страница 210: ...Touch Screens 7 52 ...
Страница 211: ...Analyzing Samples 8 ...
Страница 212: ......
Страница 220: ...Analyzing Samples 8 10 Screen 8 4 Display Calibration screen ...
Страница 231: ...AAnalyst 200 User s Guide 8 21 The results are displayed and printed Screen 8 12 Analyze page ...
Страница 244: ...Analyzing Samples 8 34 ...
Страница 245: ...Maintenance 9 ...
Страница 246: ......
Страница 268: ...Maintenance 9 24 Figure 9 6 Removing the burner assembly from the instrument ...
Страница 291: ...AAnalyst 200 User s Guide 9 47 Figure 9 15 Removing the E Box from the instrument ...
Страница 293: ...AAnalyst 200 User s Guide 9 49 Figure 9 16 Replacing the E Box ...
Страница 299: ...AAnalyst 200 User s Guide 9 55 Figure 9 20 The centering of the two lamp beams The alignment procedure is now complete ...
Страница 307: ...Troubleshooting 10 ...
Страница 308: ......
Страница 320: ...Troubleshooting 10 14 ...
Страница 321: ...Index ...
Страница 322: ......