www.orte.pl
www.orte.pl
Page | 15
No flammable materials allowed in the room.
Combustion air/air in the room
Combustion air/air in the room must be isolated from aggressive substances (e.g. alkyl
halides/fluorocarbons, substances containing chlorine or fluorine compounds). This is to avoid
corrosion.
Ensure the supply of a sufficient amount of air through the openings leading to the outside.
Risk of damage to the system due to overpressure
In order to avoid damage to the system due to overpressure, hot water can flow from the heating
circuit safety valve when heating water and preparing usable warm water.
Never close safety valves.
Never cut off the heating water circuit.
Never turn off the cooling water circuit.
Instruction to the customer (user)
Explain the method of operation to the customer.
Explain that the customer may not make any modifications or repairs.
Instruct the customer that children cannot be in the vicinity of the heating system without adult
supervision.
Fill up the commissioning and handover protocol included in this document and provide it to the
user.
Deliver the technical documentation to the customer.
5. TRANSPORT AND INSTALLATION
5.1 Transport
The device is protected against damage in transit. During transport, loading and unloading, the device must
be protected against impact, damage, crushing and against adverse environmental conditions, as they may
cause damage to the device. In case of damage to the device in transit (consignments must always be
checked on delivery), return the device to the service department in order to remove the resulting defects.
On delivery, check the completeness of the shipment. Potential objections and problems should be
reported to the supplier who is responsible for insurance.
WARNING: Risk of injuries due to moving too heavy objects and due to improper protection during
transport!
Ensure that the boiler is lifted and moved by a sufficient number of people.
Use appropriate means of transport, e.g. trolleys with fastening belts or lift trolleys.
Secure the boiler against falling.
NOTE: Damage to the system due to frost!
Install the heating system in a room protected from frost.
INFO: Observe construction supervision provisions, in particular, the current provisions related to
furnaces, construction requirements with respect to installation rooms and their ventilation.
In order to reduce the weight of the boiler during transport, the tray and the exchanger are packed
separately.
The boiler is delivered on a pallet.
Position a lift trolley to the back wall of the packaged boiler.
Secure the boiler on the transport device with a fastening belt.