ting pressure cannot
be higher than permissible pressure for devices and components used. Max. operating pressure of Pellet
Comfort boilers is 1.5 bar.
Protection of an open water heating system should consist of basic and complementary safety devices and
hardware in accordance with PN-91/B-
6. STARTING UP
Connection and commissioning of the boiler must be performed by an authorized installer having
appropriate permissions.
During installation, comply with all local laws and standards in force in the EU concerning installation and
use of the device. The device must be placed on a flat and paved surface and must be levelled in
accordance with regulations. Keep safe distance from flammable materials and walls in accordance with
regulations. Connect the device to the system in accordance with applicable provisions (open system or
installation of a safety valve). Central heating and hot usable water system must be equipped with pumps.
The exhaust pipe connected to the chimney should be as short as possible, with appropriate diameter (in
accordance with applicable standards) and inclined upward. The pipe diameter must be adapted to the
outlet pipe of the boiler. Each device must be connected to a separate chimney duct. The chimney duct
must be in compliance with applicable standards and regulations. The power supply system must be
grounded.
Before operation (after the device is connected to the chimney duct), a chimney sweep acceptance must
be performed. For safety reasons (risk of explosion), chimney sweep inspections should be done at least
once every 3 months (unless local regulations provide otherwise). Chimney sweep acceptance and further
inspections should be recorded at the end of this document.
Chimney cleaning (inspection) must be
confirmed with an appropriate chimney sweep protocol.
The chimney must have a Pa draft, at least such as
indicated in the technical specification and this document.
The device installation must provide access to cleaning the device, connector and chimney.
Check the
permeability of the supply and exhaust ventilation and combustion air duct grilles.
The device can be operated only if the whole system and boiler are in perfect condition (without traces of
damage). In case of irregularities, turn off the device until their elimination.
6.1 Before commissioning
DANGER: Risk of injuries wen opening and caused by the open boiler door!
During the boiler operation, do not open the door of the combustion chamber.
DANGER: Risk of injuries due to high temperatures!
During boiler operation, do not touch the exhaust manifold and the upper part of the boiler.
WARNING: Damage to the system due to improper operation!
Operation without enough water leads to the destruction of the boiler.
The boiler should always operate with a sufficient amount of water.
Put a filter in the cooling water inlet, before the thermostatic valve.