www.orte.pl
www.orte.pl
Page | 34
HYDRAULIC SYSTEM ACCEPTANCE AND BOILER COMMISSIONING PROTOCOL
Activities during the start-up
Measured
values
Remarks
Fill the heating system and check
the tightness of connections. Enter operating
pressure
and water quality values to the manual.
• Heating system filling pressure
Creation of operating pressure
• Heating system venting
• Checking the safety valve
• Setting the initial pressure of the expansion
vessel
Check the correctness of installation
and the tightness of exhaust connection.
Fresh air hole exists and
is not closed.
Has the tightness of the boiler door been checked?
Safety heat exchanger and thermal
outflow protection are connected without
a shut-off device?
Has the operation of the thermal outflow protection
been checked?
• flow pressure
• flow
Fireplace regulator set to
Has a return temperature
raising system been installed?
Set the minimum return temperature
and check at the boiler return.
Check the exhaust system, measure exhaust gases
and record.
• Temperature of exhaust gases
• Chimney draft
Inform the user and provide the technical
documentation
Confirmation of the proper execution
of start-up
Company stamp, signature, date
Содержание Pellet Comfort 10
Страница 9: ...www orte pl www orte pl Page 9...