www.orte.pl
www.orte.pl
Page | 19
DANGER: Risk of injuries/damage to the system due to shortage of combustion air!
Insufficient amount of combustion air can lead to the formation of tar and low-temperature gases.
Ensure the supply of a sufficient amount of air through the openings leading to the outside.
Instruct the user that air inlet holes must
always remain open.
5.7. Hydraulic connections
Hydraulic system must be done by a plumber with appropriate permissions, in accordance with
appropriate standards and hydraulic expertise. Each hydraulic system should be made on the basis of a
proper design and accepted by an authorized person.
NOTE: Damage to the installation due to leaking connection!
Mount connection tubes to the boiler ports without tension.
INFO: In order to ensure fuel-efficient operation, we recommend installing a buffer tray.
When using a buffer tray (buffer), combustion can take place at the optimum point of operation, both in
terms of energy use and emissions. Heat that cannot be used for heating at the time of production is
stored in the buffer. When the fuel inside the boiler is used, the heat stored in the buffer will be put into
heating circuit.
Both with and without buffer, the boiler works fully automatically. The buffer improves the efficiency of
the entire system.
5.7.1. Connecting the boiler to the central heating system
After placing the boiler and connecting it to the chimney, perform the following installation works:
connect the boiler to the central heating system by screwing the pipes (supply pipe and return pipe)
to appropriate connection stubs 1 ½”,
screw in the drain plug delivered with the boiler,
use appropriate seals to ensure the tightness of connections (tow,
seal tape etc.),
Before connecting the boiler to an old central heating system, rinse it to remove sludge from
radiators and pipes.
At the supply connection, connect the sensor and the thermal protection of hot water outflow
(additional equipment)
INFO: The thermal outflow protection (accessory) should be installed between the cooling water inflow A
or B and the heat exchanger inlet (cooling pipe coil).
Содержание Pellet Comfort 10
Страница 9: ...www orte pl www orte pl Page 9...