background image

www.orte.pl 

 

 

 

                                    

www.orte.pl 

                                                                                       

Page | 24 

 

Explain the installation and operation of the boiler to the customer or user. 

 

WARNING: Damage to the system due to non-compliance with the minimum return temperature! 

 

During the first start-up, set the minimum return temperature and check it at the boiler return. 

 

 

During the first start-up, check whether the heating system is filled with water and vented. 

 

During  the  first  start-up,  check  whether  the  occurring  water  pressure  is  sufficient  for  thermal 

outflow protection (recommended accessory). 

 

Check the thermal outflow protection (recommended accessory). 

 

Set the return temperature raising system to 65 ˚C. 

 

Refer  to  the  instruction  manual  of  the  controller  to  learn  about  the  ignition  and  control  of  the 

boiler. 

 
 
7. OPERATION  
 
 
7.1. Turning on the device 
 
In order to exclude any possible factory defects and defects related to improper connection, the first two 
or three runs should be made by an installer in the presence of the user. 
  
After correct installation performed solely by an authorized installer, the boiler can be turned on. In order 
to  do  that,  use  the  temperature  controller  as  described  in  this  document.  Full  description  of  the 
temperature controller is contained in the temperature controller manual RK- 2006 LPG or RK -2006 SPGM 
(separate attachment). 
 
Exercise caution during the first start-up. Pay attention to: 
 
Check whether the device is connected to power. 
- If the burner works in “maximum power” mode and the temperature on the display does not rise for a 
few  minutes,  press  STOP  on  the  controller  –  the  message  “PUTTING  OUT”  (or  “AFTERBURNING”, 
depending  on  the  version)  will  appear.  If  the  controller  does  not  respond,  disconnect  the  device  from 
power. In both cases, contact the service technician. 
-  If  the  burner  works  in  “maximum  power”  mode  and  the  temperature  on  the  display  rises,  the  central 
heating  or  hot  usable  water  pump  (depending  on  the  operation  mode)  should  start  when  the  displayed 
temperature is not higher than 42°C. 
 
If, for some reason, none of the pumps is turned on in the cases described below, immediately put down 
the boiler by pressing STOP and contact your installer. If the device does not respond to pressing STOP, 
unplug  it.  This  is  the  final  solution,  as  oxides  can  accumulate  in  the  burning  chamber.  After  such  a 
sudden unplugging from the mains, do not turn on the device again and contact the service technician. 
 

DANGER!!! Mortal danger. IF YOU WANT TO TURN OFF THE DEVICE – USE THE STOP BUTTON ON 
THE CONTROL PANEL. DO NOT UNPLUG IT BECAUSE OF THE RISK OF EXPLOSION. 

 
 

Содержание Pellet Comfort 10

Страница 1: ...apacity of 7 10 16 and 25 kW with automatic solid fuel feeding using pellet TECHNICAL AND MAINTENANCE DOCUMENTATION OPERATION AND MAINTENANCE MANUAL WARRANTY device version 04 2017 document version 13...

Страница 2: ...stance from the walls 17 5 5 Distance from flammable materials 17 5 6 Exhaust connection guide 17 5 6 1 Exhaust connection 18 5 6 2 Inlet air connection 19 5 7 Hydraulic connections 19 5 7 1 Connectio...

Страница 3: ...her with the machine Electric connections must be performed by an electrician with appropriate permissions Electric installation must be designed and performed by persons with appropriated permissions...

Страница 4: ...boiler output C 80 80 80 80 Max operating pressure bar 1 5 1 5 1 5 1 5 Safety heat exchanger o o o o Fuel consumption at rated power kg h 1 74 2 45 3 8 5 58 Exhaust temperature at max power C 82 100...

Страница 5: ...nt steel s s s s Top loading burner s s s s Automatic ash push out s s s s Heating burning element s s s s Jet fan s s s s Motoreducer x 2 s s s s Photocell optical flame control sensor s s s s Pellet...

Страница 6: ...s manual contains important information regarding safe installation commissioning and maintenance of the boiler The boiler should be installed by a qualified installer In order to ensure intended use...

Страница 7: ...6 interdependent safety systems 1 Feeder temperature sensor Installed during the commissioning in a smaller tube between the burner and the flexible pipe connected to the feeder The sensor informs abo...

Страница 8: ...ctrics wiring and a tray The controller is installed in the upper part of the boiler cover Near the controller there are fuses 5A a and 2 5A b a central switch is on the top plate of the boiler c STP...

Страница 9: ...www orte pl www orte pl Page 9...

Страница 10: ...ning hole 26 ceramic cover of the burner 9 lower cleaning hole 27 external feeder 10 hardware 28 feeder drive assembly 11 clamp 29 bearing assembly 12 burner 30 feeder flexible pipe 13 charging hopper...

Страница 11: ...ilation and gas exhaust installation During installation take into consideration the requirements of applicable regulations In case of doubt consult a fire protection expert The room where the heating...

Страница 12: ...overflow pipe Unattended minors and pets cannot be near the operating boiler Do not exceed maximum power Ensure proper air circulation in accordance with appropriate regulations Ensure chimney sweep...

Страница 13: ...re safety of 16 June 2003 Journal of Laws no 121 item 1137 amendments regulation of the Ministry of Internal Affairs and Administration of 16 July 2009 Journal of Laws no 119 item 998 on fire fighting...

Страница 14: ...rer is not responsible for damages due to the use of parts not delivered by the manufacturer Use only original spare parts and hardware Risk of carbon monoxide poisoning Insufficient air supply can ca...

Страница 15: ...t damage in transit During transport loading and unloading the device must be protected against impact damage crushing and against adverse environmental conditions as they may cause damage to the devi...

Страница 16: ...from the burner and check the feeder usage In order to determine the correct amount of the fuel quantity use the following formula 0 2 kg h pellet times the amount of kW of device power E g 0 2 x 24...

Страница 17: ...improper connection to the chimney and incorrect selection of the chimney Chimney sweep acceptance must be performed before operating the boiler INFO The boiler draws in air needed for combustion from...

Страница 18: ...temperature of exhaust gases at the rated thermal output the boiler can emit wet fumes lead to the deposition of soot and cause insufficient chimney draft This can lead to moisture and corrosion of b...

Страница 19: ...s of energy use and emissions Heat that cannot be used for heating at the time of production is stored in the buffer When the fuel inside the boiler is used the heat stored in the buffer will be put i...

Страница 20: ...r partial closure of the flow or devices and mountings reducing the internal cross section on safety pipes expansion pipe overflow pipe and venting pipe INFO The minimum capacity of the expansion vess...

Страница 21: ...of the system due to corrosion or limescale Ensure proper ventilation of the heating system Check the heating system for leaks Check the expansion vessel for proper operation The hand of the manomete...

Страница 22: ...power supply system must be grounded Before operation after the device is connected to the chimney duct a chimney sweep acceptance must be performed For safety reasons risk of explosion chimney sweep...

Страница 23: ...ng temperature drops below 0 C can be grounds for not accepting the complaint and refusing to repair or replace the boiler Before operation pay attention to the following instructions on personal safe...

Страница 24: ...on of the temperature controller is contained in the temperature controller manual RK 2006 LPG or RK 2006 SPGM separate attachment Exercise caution during the first start up Pay attention to Check whe...

Страница 25: ...n Pellet Comfort boilers burning only high quality pellet with the diameter from 6 to 8 mm made of sawdust of deciduous or coniferous trees without dust classified as C1 in accordance with standard 30...

Страница 26: ...the controller display When the lightness in the combustion chamber drops to the lower value the lighter is turned on to re ignite the fuel The state of device can be evaluated based on the displayed...

Страница 27: ...e burner housing temperature drops delete the message on the display by pressing STOP restart by pressing START 4 boiler overheating alarm BOILER OVERHEATING message appears water temperature exceeded...

Страница 28: ...t back to the manufacturer 7 7 2 Replacement of the photoelement Turn of the burner by pressing STOP After the fan turns off after 10 30 minutes depending on the settings unplug the device and unscrew...

Страница 29: ...re that the doors are tightly closed and secured lock on the round handle must be in the horizontal position Plug the feeder pipe to the fireplace make sure that it is pushed to the burner cover Then...

Страница 30: ...ing care that it is placed below the fixed part 9 Check whether the grille tip is in the right place 10 Replace and connect the burner in reverse order 8 3 Cleaning the heating system NOTE Improper op...

Страница 31: ...ater from the heating system at the lowest point to protect it from freezing In order to shut down the boiler completely burn all fuel REMEMBER IF YOU WANT TO TURN OFF THE DEVICE USE THE STOP BUTTON O...

Страница 32: ...company is responsible for the first commissioning and setting the parameters 9 The warranty does not apply in the case of installation commissioning and operation not in compliance with the manual T...

Страница 33: ...r Year of manufacturing Seal SELLER filled the final company selling the device to the user Company Address Phone number Date Signature and stamp of the seller AUTHORIZED SERVICE company responsible f...

Страница 34: ...he tightness of exhaust connection Fresh air hole exists and is not closed Has the tightness of the boiler door been checked Safety heat exchanger and thermal outflow protection are connected without...

Страница 35: ...ocumentation along with the filled warranty card during the start up there have been no material defects or distortions Date Legible signature of the User CHIMNEY SWEEP ACCEPTANCE Company name Address...

Страница 36: ...s it open Has the thermal outflow protection been checked Flow pressure Flow Checking operating pressure Vent the heating system Check the safety valve Set the initial pressure of the expansion vessel...

Страница 37: ...ate Legible signature Stamp Date Legible signature Stamp Date Legible signature Stamp Date Legible signature Stamp Date Legible signature Stamp Date Legible signature Stamp Date Legible signature Stam...

Страница 38: ...Date Legible signature Stamp Date Legible signature Stamp Date Legible signature Stamp Date Legible signature Stamp Date Legible signature Stamp Date Legible signature Stamp Date Legible signature St...

Страница 39: ...dzia confirms that heating boilers Pellet Comfort are in accordance with appropriate directives and standards and updates Directives 2006 95 EC 2004 108 EC 89 106 EC 2006 42 EC Applied standards EN 30...

Отзывы: