Remove the Cable Management Arm
5.
For both types of kits, remove the two screws securing each hardmount bracket
at the front of the rack.
6.
For the sliding rail kit, extend the server to the locked position, then press the
release buttons on the rails to pull the server out of the rack.
7.
Lift the server from the rack and set it aside on an antistatic mat.
8.
Remove the top cover.
See
“Remove the Top Cover” on page 67
Related Information
■
“Prevent ESD Damage” on page 55
■
“Remove the Top Cover” on page 67
■
“Install the Top Cover” on page 246
■
“Safety Information” on page 44
Remove the Cable Management Arm
Follow this procedure to remove the optional 19-inch sliding rail kit with the CMA. The CMA
applies only to the 4-Post, 19-Inch rack with sliding rails for servers.
Before you begin this procedure, refer to
“Installing the 19-Inch Sliding Rail Kit With the
Netra SPARC S7-2 Server Installation Guide
and identify CMA connectors A, B, C,
58
Netra SPARC S7-2 Server Service Manual • February 2017
Содержание Netra SPARC S7-2
Страница 1: ...Netra SPARC S7 2 Server Service Manual Part No E73207 03 February 2017 ...
Страница 2: ......
Страница 12: ...12 Netra SPARC S7 2 Server Service Manual February 2017 ...
Страница 24: ...24 Netra SPARC S7 2 Server Service Manual February 2017 ...
Страница 42: ...Server Fault Remind Button Operation 42 Netra SPARC S7 2 Server Service Manual February 2017 ...
Страница 84: ...84 Netra SPARC S7 2 Server Service Manual February 2017 ...
Страница 108: ...108 Netra SPARC S7 2 Server Service Manual February 2017 ...
Страница 140: ...140 Netra SPARC S7 2 Server Service Manual February 2017 ...
Страница 150: ...150 Netra SPARC S7 2 Server Service Manual February 2017 ...
Страница 158: ...158 Netra SPARC S7 2 Server Service Manual February 2017 ...
Страница 192: ...192 Netra SPARC S7 2 Server Service Manual February 2017 ...
Страница 216: ...216 Netra SPARC S7 2 Server Service Manual February 2017 ...
Страница 258: ...258 Netra SPARC S7 2 Server Service Manual February 2017 ...