
3
Installa
tion
3-14
11. Checking the robot controller operation
This section explains how to check the controller operation using a special connector that comes with the
controller and an applicable robot.
11.1 Controller wiring
Make the connections to the controller as described below.
• Power supply (Do not supply power until you actually begin the operation check.)
• Robot cable
• Programming box
• Absolute battery (absolute type only)
• Regenerative unit (if needed)
• SAFETY connector (supplied)
Short-circuit the following pins of the SAFETY connector supplied with the controller.
SAFETY connector
A1 – A2
A3 – A4
A5 – A6
B1 – B2
B3 – B4
B5 – B6
Programming box
SAFETY connector
(supplied)
YRCX
Connected to OMRON robot
Содержание R6YXC1000
Страница 1: ...7 6HULHV DW 1R 1 5 5RERW RQWUROOHU 86 5 6 0 18 6 5 5RERWV 5 6HULHV...
Страница 2: ......
Страница 10: ......
Страница 40: ......
Страница 42: ......
Страница 46: ......
Страница 48: ......
Страница 54: ......
Страница 56: ......
Страница 64: ......
Страница 80: ......
Страница 82: ......
Страница 102: ......
Страница 108: ......
Страница 110: ......
Страница 136: ......
Страница 168: ......
Страница 170: ......
Страница 174: ...8 Periodic inspection 8 4...
Страница 176: ......
Страница 182: ......
Страница 256: ......
Страница 258: ......
Страница 259: ......
Страница 260: ...DW 1R 1 XWKRUL HG LVWULEXWRU 3ULQWHG LQ XURSH...