8. Communication Test and Collecting Start
8-5
8.4. Start Collecting
When no problem is found in the communication test, transition the status of EQ100 from setup
to collecting and start the measured data collecting.
There are following three ways to transition the status setup to collecting:
- Pressing RUN/STOP button on the EQ100 front end
- Operation by EQ-Manager
- Operation on Web UI screen
Precautions for
Correct Use
- Transition to the collecting status (starting collecting) cannot be done if the setup DIP
switches SW7=ON (EQ project loading from SD card enabled), SW8=ON (firmware updating
from SD card enabled), or SW10=ON (safe mode startup). Always set all of the setup DIP
switches SW7, SW8, and SW10 to OFF.
Reference
- When EQ100 transitions to the collecting status, the collecting status indicator on the EQ100
front end turns on. If the transition to collecting status is successful but measured data from
one or more measurement devices could not be acquired, the device alarm indicator flashes.
Starting Collecting by EQ100 Operation
8.4.1.
To start collecting, press the RUN/STOP button on the EQ100 front end for 1 second or longer.
The buzzer is sounded and EQ100 transitions to the collecting status. When the collecting is
started successfully, the RUN LED turns on.
RUN/STOP Button
Содержание EQ100-E
Страница 1: ...Sensor Network Server Model EQ100 E User s Manual Catalog No N196 E1 01H ...
Страница 55: ...2 Specifications 2 24 2 5 Dimensions Top View Front View Unit mm ...
Страница 92: ...7 EQ100 Settings 7 3 4 Click OK to view the EQ project setup menu Setting Menu ...
Страница 197: ...9 Web UI Function 9 24 3 In the Save As dialog box enter a destination to save and click Save Download is completed ...
Страница 255: ... MEMO ...