OMNI 4000/7000 Operations and Maintenance Guide
– Rev F
3-44
OMNICONNECT® Operations
4.
To enter a batch size, go to the Actions
ribbon and click
Operate
.
5.
a. Expand the
Control
tree.
b. Select the same Meter Run or Station
batch to edit that you selected in
Step 2.
6.
a. Click on the
Batch Stack
tab.
b. Double-click on the numbered row of the batch you need to edit to open the
Edit
Batch Stack
window.
7.
a. Enter the batch size amount in the
Batch Size
field.
b. Click
Apply
to update the batch size
in the sequence list.
The
Batch Preset Warning
and the
Batch Preset Reached
flags can be used in
custom Boolean and Variable statements to end batches or control systems
operators can monitor batches using the flags. The operators can remotely close
valves in advance of ending batches and open valves to start batches on
new products.
Now that there is a number set in
the
Batch Preset Warning
field
and a fixed
Batch Size
, you will
receive both the
Batch Preset
Warning
and the
Batch Preset
Reached
flags.
Содержание 4000 Series
Страница 1: ...Series 4000 7000 Operations Maintenance Guide...
Страница 21: ...OMNI 4000 7000 Operations and Maintenance Guide Rev F 2 4 OMNI 4000 7000 Overview Figure 2 2 OMNIPANEL...
Страница 23: ...OMNI 4000 7000 Operations and Maintenance Guide Rev F 2 6 OMNI 4000 7000 Overview Figure 2 4 OMNI Modbus Tester...