OMNI 4000/7000 Operations and Maintenance Guide
– Rev F
3-31
OMNICONNECT® Operations
2.
a. Expand the
Control
tree.
b. Select
Prover
to see the
Prover
Control
screen to the right.
3.
a. In the
Volume/Mass Prove Control
drop-down box, select a Meter Run.
b. Click the
Prove Request
button.
4.
The prove sequence begins after a prove is requested (see Section 3.5.3 Prove Sequence
for more information). Status messages will appear in the
Volume Prove Status
field and
the run information box will populate automatically. At any time, click
Prove Abort
to stop
the prove sequence process while a prove is running.
3.5.6 Remote Prove Request
You can use Modbus communications to remotely trigger a prove. Write to the appropriate
address from the following command points to execute a prove sequence:
•
1732
– Meter 1 Prove Request
•
1733
– Meter 2 Prove Request
Содержание 4000 Series
Страница 1: ...Series 4000 7000 Operations Maintenance Guide...
Страница 21: ...OMNI 4000 7000 Operations and Maintenance Guide Rev F 2 4 OMNI 4000 7000 Overview Figure 2 2 OMNIPANEL...
Страница 23: ...OMNI 4000 7000 Operations and Maintenance Guide Rev F 2 6 OMNI 4000 7000 Overview Figure 2 4 OMNI Modbus Tester...