
Inspections
Operation Manual
3-12
6.
After the specified inspection time has elapsed, the macro table is lowered and the loader proceeds to
Back Macro inspection.
You can change the wafer tilt position (angle) for observation using the [Back Macro Tilt Angle] button. ...
j
* Press the [Start] button if the [Inspection Time] control is set to [
∞
].
7.
After the specified inspection time has elapsed, Back Macro inspection is completed and the first wafer is
transferred onto the vacuum stage.
8.
After the first wafer is transferred onto the vacuum stage, the second wafer is transferred to the Top Macro
inspection position, and the loader starts the Top Macro inspection of the second wafer.
9.
After the specified inspection time has elapsed for the Top Macro inspection of the second wafer, the
macro table is lowered and the loader starts the Back Macro inspection of the second wafer.
10. After the specified inspection time has elapsed for the Back Macro inspection of the second wafer, the
L-arm is lowered. The wafer is placed on the macro table and rotated counterclockwise about 20 degrees,
and then the loader proceeds to the 2nd Back Macro inspection.
11. After the specified inspection time has elapsed for the 2nd Back Macro inspection of the second wafer, the
L-arm is lowered, waiting for the next wafer.
Ref.
*
Press the [Start] button if the [Inspection Time] control is set to [
∞
].
*
Wafers are not transferred onto the microscope if the stage is not in the wafer transfer position at the time
of wafer transfer.
*
By setting the vacuum stage to the wafer transfer position during Top Macro or Back Macro inspection, the
Macro inspection is terminated before the inspection time is completed. Microscope inspection is given
preference and the wafer is transferred onto the vacuum table.
*
If the Microscope inspection is not required, press the [Unload] button. The first wafer is unloaded into the
cassette and the second wafer is transferred to the Top Macro inspection position.
*
If [2nd Back Macro] is selected for the inspection sequence, refer to
[3-2-4 Back Macro Insp 2nd
Back Macro Inspection]
.
Page
Содержание AL120-6 Series
Страница 2: ...This page intentionally left blank ...
Страница 9: ...Operation Maintenance Manual Introduction Safety Precautions i 7 Page AL120 86 Series Unit mm ...
Страница 16: ...Introduction Conformity Standards Operation Maintenance Manual i 14 Page ...
Страница 17: ...Operation Maintenance Manual Introduction Conformity Standards i 15 Page ...
Страница 18: ...Introduction Conformity Standards Operation Maintenance Manual i 16 Page This page intentionally left blank ...
Страница 21: ...Operation Manual Table of Contents C 3 Page 4 When a Wafer is on the Vacuum Stage 5 10 ...
Страница 22: ...Operation Manual Table of Contents C 4 This page intentionally left blank Page ...
Страница 58: ...Inspections Operation Manual 3 14 This page intentionally left blank Page ...
Страница 78: ...Troubles and Countermeasures Automatic Unloading Operation Manual 5 12 Page This page intentionally left blank ...
Страница 79: ...This page intentionally left blank ...