
Operation/Maintenance Manual
Nomenclature
1-1
Page
1 Nomenclature
Nomenclature
1-1 Wafer Loader Main Body
Your loader may not have all the units shown in the Figure.
*The L-arm and the joystick are integrated in the LMB models.
Hand guard
AC line receptacle
Circuit breakers
Stage vacuum
tube connector
A2-arm
A1-arm
Stage operation
permission LED
L-arm
Macro (center) table
Orientation flat alignment sensor
Cassette table
(elevator)
Cassette guide
Warning label
Vacuum tube
receptacle
Operation panel
Joystick
Lock ring
Main switch
Liquid crystal panel
Содержание AL120-6 Series
Страница 2: ...This page intentionally left blank ...
Страница 9: ...Operation Maintenance Manual Introduction Safety Precautions i 7 Page AL120 86 Series Unit mm ...
Страница 16: ...Introduction Conformity Standards Operation Maintenance Manual i 14 Page ...
Страница 17: ...Operation Maintenance Manual Introduction Conformity Standards i 15 Page ...
Страница 18: ...Introduction Conformity Standards Operation Maintenance Manual i 16 Page This page intentionally left blank ...
Страница 21: ...Operation Manual Table of Contents C 3 Page 4 When a Wafer is on the Vacuum Stage 5 10 ...
Страница 22: ...Operation Manual Table of Contents C 4 This page intentionally left blank Page ...
Страница 58: ...Inspections Operation Manual 3 14 This page intentionally left blank Page ...
Страница 78: ...Troubles and Countermeasures Automatic Unloading Operation Manual 5 12 Page This page intentionally left blank ...
Страница 79: ...This page intentionally left blank ...