Adjustment
Input Screw Adjustments -
The boiler is equipped with a Throttle/Input Adjustment Screw, located on the Gas
Valve and Venturi Assembly. It is used to adjust the flow of gas leaving the gas valve, which enters the Venturi
and then the combustion air stream. Turn the adjustment screw in (clockwise) to reduce the flow of gas, make
combustion leaner, and reduce the concentration of CO
2
in the flue gases. To increase the CO
2
level and flow of
gas in the combustion air stream, adjust the Throttle screw out (counterclockwise).
The input screw is a multiple turn valve. Fully open to close is approximately 17 turns. Typical adjustment for
Natural Gas is 0-1 full turns in or out. Typical adjustment for LP Gas is 0-3 full turns in or out. See Figure 9-1
for input screw location.
Combustion Calibration
- To calibrate burner operation, perform the following procedure using a calibrated
combustion analyzer capable of measuring CO
2
and CO from Natural and Propane Gas burning boilers:
1.
Operate the unit at the maximum modulation rate, see Table 9-2.
2.
Ensure the gas line pressure is maintained within tolerance, see Table 9-1.
3.
While at the maximum modulation rate, measure the CO
2
and CO; adjust as necessary, using the Throttle
Screw, to be within the limits listed in Table 9-1.
4.
Operate the unit at the minimum modulation rate (Table 9-2). Ensure the combustion remains smooth and
CO
2
and CO remain within the limits (Table 9-1). If not, do not adjust further, contact NTI for assistance.
Flue Gas Analysis and Adjustment
Each Trinity Ts is factory set to operate with Natural Gas, for boilers field converted to operate with Propane
Gas, a flue gas analysis and adjustment is mandatory. See Table 7-1 and propane conversion instructions.
Failure to perform the flue gas analysis and adjustment detailed in this section may result
in erratic and unreliable burner operation, leading to reduced efficiency, increased fuel
consumption, reduced component life, heat exchanger combustion deposits, and general unsafe operation.
Failure to follow these instructions may result in serious injury or death.
Analysis
– Perform flue gas analysis, and adjust throttle/input screw as required until CO
2
and CO levels are
within acceptable limits.
Figure 9-1 Ts80 Orientation
Gas Valve and Venturi Assembly
Throttle/Input Adjustment Screw
Increase gas
Turn Counter Clockwise
Decrease gas
Turn Clockwise
Gas Valve
Gas In
Venturi
Air Intake
Side View
View from Below
Throttle/Input
Adjustment Screw
Orifice
Location
(Kit 82650-1)
Manifold
Pressure
Test Port
Line
Pressure
Test Port
Содержание TRINITY Ts80
Страница 38: ...Trinity Ts Installation and Operation Instructions Ts Series 38 Figure 11 2 Ts80 Model Low Voltage Field Wiring...
Страница 40: ...Trinity Ts Installation and Operation Instructions Ts Series 40 Figure 12 1 b Ts80 Ladder Logic Diagram...
Страница 48: ...Trinity Ts Installation and Operation Instructions Ts Series 48 Figure 13 4 Diagnostic Mode Screens...
Страница 73: ...Ts Series Installation and Operation Instructions Trinity Ts 73 NOTES...
Страница 74: ...Trinity Ts Installation and Operation Instructions Ts Series 74 NOTES...
Страница 75: ...Ts Series Installation and Operation Instructions Trinity Ts 75 NOTES...