Trinity Ts
│
Installation and Operation Instructions
Ts Series
36
Figure 11-1 Ts80 Model
Line Voltage Field Wiring
Table 11-1 Line Voltage Field Connections
Connection
Location
Description
PUMP C
9
120VAC output to the Central Heating circulator; powered during a demand for Central
Heat (Thermostat).
PUMP B
10
120VAC output to the Boiler circulator; powered during all demands for DHW, and
Central Heat (Thermostat). This output is not used for all plumbing configurations, see
"Field Wiring".
PUMP A
11
120VAC output to the DHW circulator; powered during a demand for DHW.
L2
(NEUT.)
12
Location for connecting neutral of the power supply and all circulators.
L1
(120VAC)
13
Location for connecting line voltage of the power supply. Note most installation codes
require the installation of a service switch to break line voltage to the appliance.
Содержание TRINITY Ts80
Страница 38: ...Trinity Ts Installation and Operation Instructions Ts Series 38 Figure 11 2 Ts80 Model Low Voltage Field Wiring...
Страница 40: ...Trinity Ts Installation and Operation Instructions Ts Series 40 Figure 12 1 b Ts80 Ladder Logic Diagram...
Страница 48: ...Trinity Ts Installation and Operation Instructions Ts Series 48 Figure 13 4 Diagnostic Mode Screens...
Страница 73: ...Ts Series Installation and Operation Instructions Trinity Ts 73 NOTES...
Страница 74: ...Trinity Ts Installation and Operation Instructions Ts Series 74 NOTES...
Страница 75: ...Ts Series Installation and Operation Instructions Trinity Ts 75 NOTES...