Trinity Ts
│
Installation and Operation Instructions
Ts Series
18
Figure 5-1
Termination Clearances Quick Reference Diagram
Illustrations of Termination Clearances
Figure 5-2
Side Wall Termination - Clearances Above Grade
G
– Letter represents a specific Termination Position. Refer to Table 5-1 for corresponding termination clearances.
Concentric Vent
Termination
Q
Two-Pipe
Termination
F
Clearance “Q”
Adjacent to Public
Walkway or Driveway
Minimum 7ft [2.13 m]
G
Clearances “F” and “G”
Canada – Minimum 3 ft [915 mm]
The US
– Minimum 1 ft [305 mm]
Содержание TRINITY Ts80
Страница 38: ...Trinity Ts Installation and Operation Instructions Ts Series 38 Figure 11 2 Ts80 Model Low Voltage Field Wiring...
Страница 40: ...Trinity Ts Installation and Operation Instructions Ts Series 40 Figure 12 1 b Ts80 Ladder Logic Diagram...
Страница 48: ...Trinity Ts Installation and Operation Instructions Ts Series 48 Figure 13 4 Diagnostic Mode Screens...
Страница 73: ...Ts Series Installation and Operation Instructions Trinity Ts 73 NOTES...
Страница 74: ...Trinity Ts Installation and Operation Instructions Ts Series 74 NOTES...
Страница 75: ...Ts Series Installation and Operation Instructions Trinity Ts 75 NOTES...