b. Click Reboot Controller.
During the reboot, the following screen appears:
The appliance reboots and rejoins the grid. This process can take up to 20 minutes.
c. On the Nodes page, verify that the appliance node returns to the expected status by viewing
the icon to the left of the node name.
When the reboot is complete, the Tasks tab looks like the following screenshot:
9. From SANtricity System Manager, confirm that the new controller is Optimal, and collect
support data.
Related information
NetApp E-Series Systems Documentation Center
Hardware Installation and Maintenance Guide for SG5700 Appliances
77
Maintaining the SG5700 appliance