Overview
DEC 2000
3-1
SC
t
300 BTS Hardware Installation, ATP and FRU Procedures
PRELIMINARY
Overview
This chapter provides the information and procedures to:
S
Unpack the equipment and inspect for damage.
S
Install rack, pole or ceiling adapters.
S
Install the mounting bracket on a wall, pole, rack or ceiling.
S
Attach the unit and covers to the mounting bracket.
Procedure order
The process of installing the mounting bracket and Remote GPS receiver
requires that the following procedures be completed in the order shown.
1. Unpack the equipment and inspect for damage.
2. Install the mounting hardware on a wall, rack, pole or ceiling.
3. Attach the back solar cover.
4. Install the Remote GPS head.
3