Dimensions and Clearances
– continued
DEC 2000
2-15
SC
t
300 BTS Hardware Installation, ATP and FRU Procedures
PRELIMINARY
Figure 2-7: Installation and Functional Clearances for Primary Surge Suppressor (without Solar Covers)
200
mm clearance for tool access
600 mm from front of unit for unit installation and removal
PRIMARY SURGE SUPPRESSOR WITHOUT SOLAR COVERS
200 mm clearance for tool access
2