Site I/O, Span Line, RGPS and Modem Cabling for Sites Equipped With
Primary Surge Suppressor
– continued
PRELIMINARY
SC
t
300 BTS Hardware Installation, ATP and FRU Procedures
DEC 2000
5-26
Figure 5-23: Punchdown Block Location
PUNCHDOWN BLOCK
PRIMARY SURGE
SUPPRESSOR
Figure 5-24: Punchdown Block
5