Unpacking the Equipment and Inspecting for Damage
PRELIMINARY
SC
t
300 BTS Hardware Installation, ATP and FRU Procedures
DEC 2000
3-2
Objective
The objective of this procedure is to unpack the equipment and inspect it
for damage.
How System is Packed
A unit is shipped in two boxes. Box 1 contains site installation specific
components and box 2 contains the unit itself. All of the following are
shipped in box 1.
Box 1
S
Solar or fin covers
S
Universal mounting bracket
S
Rack mounting adapters and hardware
S
Pole mounting adapters and hardware
S
Ceiling mounting adapter (Optional Kit T391AA)
S
External cables (AC input, DC input and SU)
S
Lower pin
S
Site I/O junction box and cable assembly
S
Terminations
S
AC Installation Box (required for outdoor applications)
Box 2
S
Microcell or Picocell unit
Box 3 (Optional)
S
Primary Surge Suppressor
S
Solar covers
S
Mounting bracket
S
Rack mounting adapters and hardware
S
Pole mounting adapters and hardware
S
Ground cables
The following are shipped separately:
S
Short duration battery (optional) (Kit T392AA)
S
Remote GPS receiver (optional)
Inspecting for Damage
Before installing any equipment, inspect it for damage. Report any
damage found to the Site Manager.
Only remove the equipment from the shipping containers when you are
ready to install.
3