Power, Ground and Battery Cabling for Sites Equipped With Optional
Primary Surge Suppressor
– continued
DEC 2000
5-17
SC
t
300 BTS Hardware Installation, ATP and FRU Procedures
PRELIMINARY
Table 5-8: Procedure to Install DC Input Cable(s)
Step
Action
1
Connect the loose wires of the DC Input Cable (cable U) to
the customer defined DC power source. Refer to Table 5-4
for wiring information.
2
Verify all connections of cable U with an ohmmeter prior to
routing the cable.
3
Route cable U from the DC power supply to the unit location.
5