Dimensions and Clearances
– continued
PRELIMINARY
SC
t
300 BTS Hardware Installation, ATP and FRU Procedures
DEC 2000
2-16
Figure 2-8: Installation and Functional Clearances for Primary Surge Suppressor (with Solar Covers)
200
mm clearance for tool access
600 mm from front of unit for FRU installation and removal
PRIMARY SURGE SUPPRESSOR WITH SOLAR COVERS
200 mm clearance for tool access
2