Dimensions and Clearances
– continued
PRELIMINARY
SC
t
300 BTS Hardware Installation, ATP and FRU Procedures
DEC 2000
2-14
Figure 2-6: Installation and Functional Clearances for PicoCell Units (without Solar Covers)
50 mm air exhaust area
100 mm clearance for installation handles
200 mm clearance for tool access
50 mm air intake area
50 mm Air Intake Area (Functional)
600 mm from front of unit for FRU installation and removal
0196–O_IL.doc
PICOCELL WITHOUT SOLAR COVERS
2