Site I/O, Span Line, RGPS and Modem Cabling for Sites Equipped With
Primary Surge Suppressor
– continued
DEC 2000
5-27
SC
t
300 BTS Hardware Installation, ATP and FRU Procedures
PRELIMINARY
Pin and Signal Information for
Surge Suppressor Punchdown
Block Cabling
Table 5-14 gives the pin and signal information for connecting the loose
wires to the customer locations on the Punchdown Block.
5