Chassis Information
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
E X E C U T I V E
7 • 2 5 5
rate thermostat in the bay and a separate heat exchanger for bay heat.
Again, depending on use it may need to be bigger, or the temperature set
differently.
• Never try to charge a frozen battery. The battery will need to be thawed out
and charged at a slow rate and each cell checked with a hydrometer.
• The furnace should be kept running to provide heat to storage bays.
• The engine speed should not be above a low idle until the coolant tempera-
ture gauge needle moves, or 20 minutes have elapsed. This will provide
adequate warm up for the fluids.
• Extra insulation may be needed for the bay doors.
• Insulation should be added under the bedroom floor and cargo bays.
• Insulation should be added around the entry step well.
• Adding extra batteries and solar panel resulting from the increase draw of
heating coils.
• Spray foam offers a small insulation value.
• Adding an additional heater for ducting in the storage bays.
The diesel engine will operate in extremely cold environments if the engine is
properly prepared and maintained. The correct lubricants, fuels, and coolant
MUST be used for the cold weather range for which the motorhome is being
operated.
• 12 Volt DC test light, this may be helpful on the phone with a technician.
• Battery hydrometer, to check each battery cell during maintenance.
• One 12-volt continuous duty solenoid.
• An assortment of spare fuse.
• One link kit for ride height control assembly.
• A spare alternator belt.
• Hump hose clamp for the Charge Air Cooler.
CHECKLIST
- ITEMS TO CARRY
Polarity Tester.
Содержание Executive 2001
Страница 1: ......
Страница 6: ...E X E C U T I V E SECTION 1 WARRANTY INFORMATION...
Страница 7: ......
Страница 22: ...E X E C U T I V E SECTION 2 OPERATING SAFETY...
Страница 23: ......
Страница 46: ...E X E C U T I V E SECTION 3 APPLIANCES EQUIPMENT...
Страница 47: ......
Страница 106: ...E X E C U T I V E CHAPTER 4 WATER LP GAS SYSTEMS...
Страница 107: ......
Страница 129: ...Water LP Gas Systems EXECUTIVE 4 1 2 9 NOTES...
Страница 130: ...E X E C U T I V E SECTION 5 ELECTRICAL SYSTEMS...
Страница 131: ......
Страница 177: ...Electrical Systems 5 1 7 7 EXECUTIVE N NO OT TE ES S...
Страница 178: ...E X E C U T I V E SECTION 6 UNIT CARE MAINTENANCE...
Страница 179: ......
Страница 203: ...Unit Care Maintenance EXECUTIVE 6 2 0 3 NOTES...
Страница 204: ...E X E C U T I V E SECTION 7 CHASSIS INFORMATION...
Страница 205: ......
Страница 264: ...Chassis Information EXECUTIVE 7 2 6 4 NOTES...
Страница 269: ...Chassis Information EXECUTIVE 7 2 6 9 NOTES...